[Case Study] Achieving a reduction in construction time by utilizing pre-fabricated water supply and drainage piping.
Reducing noise, dust, and odor issues caused by on-site work! Here are examples of utilizing pre-processed products.
There was a challenge in shortening the construction schedule due to the time-consuming process of material arrangement, cutting of PVC pipes, and gluing of PVC fittings using limited equipment on-site. We confirmed the specifications such as the shape and dimensions of the PVC piping used on-site, as well as the bonding points between the PVC pipes and fittings, created the drawings, conducted prototypes, and mass-produced pre-processed PVC piping for delivery to the site. After implementation, the on-site work time was reduced from about 3 days to 1 week, allowing for a shortened construction schedule. 【Case Overview】 ■ Challenge - Difficulty in shortening the construction schedule ■ Solution - Confirmed specifications, created drawings, conducted prototypes, and mass-produced pre-processed PVC piping for delivery to the site. *For more details, please refer to the PDF document or feel free to contact us.
- Company:宮田工業所 名古屋工場、栃木工場、福岡工場、三重工場、名古屋営業所、宇都宮営業所、福岡営業所、本社
- Price:Other